| |
| Major Projects |
Libya Project
Infrastructure Mapping, Investigation and Design for 100 towns in Libya |
| |
Combined cycle power plant, Kawas, Surat - (1,400 acres)
|
|
|
|
| |
| |
Refinery and township area, Bina (M. P. )
|
|
|
|
| |
| |
Chemical plant site, Mangalore
|
|
|
|
|
| |
Devanahalli international airport, L&T and Hochtif - (4,200 acres)
|
|
|
|
| |
| |
Macro level survey, topographical and engineering surveys and related investigations - (4,300 acres)
|
|
|
|
| |
| |
Development project sites at Hyderabad, Karnataka, Nasik and Orissa - (6,000 acres)
|
|
|
|
|
| |
Strategic crude oil storage site, Mangalore - (258 acres)
|
|
|
|
| |
| |
LNG tank area, Dabhol - (232 acres)
|
|
|
|
| |
| |
Topographical survey for Airport at Hassan, Karnataka
|
|
|
|
|
| |
330 MW Power Plant, Bhander Dist. Gwalior - (247 acres)
|
|
|
|
| |
| |
HLL Premises, Brookfield, Bangalore - (26 acres)
|
|
|
|
| |
| |
Deogarh West Coast refinery and Vizag Lova Gardens – (2,400 acres)
|
|
|
|
|
| |
Water shed project, Berambadi – (1,115 acres)
|
|
|
|
| |
| |
Major units of steel plant & raw water reservoir, 2 x 250 MW Power Plant, Toranagallu, including setting out work and site supervision – (500 acres)
|
|
|
|
| |
| |
- Post construction survey and preparation of As-Built drawings, IT Park, Bangalore
- High precision control survey for 2.5 Km long fly over Sirsi Circle, Bangalore
|
|
|
|
|
| |
Township survey and related investigation for peripheral roads – (300 acres)
|
|
|
|
| |
| |
Engineering and road alignment survey – (5,000 acres)
|
|
|
|
| |
| |
Dolphin Hill Range township and approach road - (226 acres)
|
|
|
|
|
| |
- Integrated steel plant, Tadipatri
- SNC Lavalin Inc., 1100, Rene-Levesque Blvd., W., Montreal Canada.
- Transmission line survey for upgradation of Kerala Electricity Board – (55Km)
|
|
|
|
| |
| |
Calicut airport – (15 acres)
|
|
|
|
| |
| . |
Transmission line survey for upgradation of Kerala Electricity Board – 55 km
|
|
|
|
|
| |
Mobilization & Demobilization of Equipments, Desktop study of Diversion route
|
|
|
|
| |
| |
- Topographical Survey and Index Mapping for Mundar Port.
- Collecting and Compiling existing industrial unit details related to Narol Industrial estate
|
|
|
|
| |
| |
Topographical Survey for well no. 6 & 7 and School building near GSPL – Niko Gas gathering station
|
|
|
|
|
| |
Topographical survey for the maps taking out grid levels at 10m intervals and marking countours at 0.25.
|
|
|
|
| |
| |
Providing assistance for acquiring 4 acres land at Beach Park.
|
|
|
|
| |