| Major Projects |
- Mapping: Aerial Photo and Satellite Image and Land Surveys, 3D Modelling,Feasibilty, Routing, Geotech and Related Investigation, ROU Acquistion, Environmental Clearance and Permitting Assistance in India, Libya and Middle East.
- SECON is one of the most experienced firms in this area and has done more than 65,000 km of Pipeline Projects in these services in North, East, West and Southern Indian States across varied terrain like Mountains, Deserts, Thick Vegetation, Remote and Undeveloped Areas and other Difficult Terrain.
- SECON has done the City Gas Grid Mapping, Field Data Collection, Consumer Indexing and Distribution Planning for 22 Cities in India
|
| 618 km long Hazira-Dabhol pipeline |
- Pipeline traverses through highly controversial & disturbed belt of Hazira-Dabhol with heavily built-up areas of Mumbai & Western Ghats (dense forests with large creeks & water bodies)
- Comprehensive Services - Reccee & center line survey, related investigations, cadastral survey, data generation for ROU acquisition, assisting CA for 3(1) & 6(1) publication, serving notices & payment of compensation
- Other Services - Permitting & clearance from various statutory authorities, road, rail lines, foreign pipelines, underground and over ground utilities, coastal and defence lands
|
|
|
|
|
| 1,800 km long pipeline project |
Time critical job consisting re-route survey, field data capture to prepare ‘As-Built’ drawing & documentation
|
|
|
|
| |
| 800 km long Myanmar-Bangladesh-India trans-national pipeline |
Difficult North-East hilly terrain, and threat of constant terrorist activity
|
|
|
|
| |
| 1,006 km long Mundra-Bathinda Crude Oil Pipeline |
Challenging assignment through Rann of Kutch & Thar desert
|
|
|
|
|
| 2,090 km long Gas Pipeline to Goa-Hyderabad-Kakinada, Bangalore-Chennai-Ongole, Chakan-Uran-Dabhol, Jamnagar-Rewari-1100 km |
- Latest tools and software used to capture, download and process data
- Seamless drawings for route maps, alignment sheets, crossing details, stratification, cadastral survey & ROU acquisition on GIS platform
- Best industry practices adopted using satellite imagery, DGPS & Total Stations
- In-house software such as SeconMap, ROU Master & PDMS (Pipeline Database Management System) used for documentation, presentation and retrieval of data.
|
|
|
|
| |
| 1,320 km long Kochi-Kayakulam-Bangalore, Bangalore-Mangalore-Coimbatore Pipeline |
Pipeline traverses in extremely difficult terrain of Western Ghats and Dimbam forests of Tamil Nadu and densely populated Kerala State
|
|
|
|
|
| 410 km long Jullandhar–Jammu-Pathankot pipeline |
Logistically difficult terrain to work under constant terrorist threat
|
|
|
|
| |
| 265 km long Bailadila-Vishakapatnam – Iron ore Slurry pipeline |
Pipeline traverses through extremely difficult, highly undulating tribal belts of Central India and East-Coast with marked variations in ground profile
|
|
|
|
|
| |
- Goa-Kolhapur-Solapur-Hyderabad Pipeline Project - 680 km
- Kakinada – Hyderabad – Ahmedabad Pipeline Phase I, II & III. – 1190 km
- Bhopal - Kanpur Pipeline Project - 460 km
- Jamnagar - Rewari Pipeline Project - 1030 km
- Chennai - Bangalore - Cudappah Pipeline Project - 460 km
|
|
|
|
| |
| 1,200 km long pipeline distribution network |
Comprehensive survey, investigation, ROU Acquisition, Way Leave License and permitting services for Talasari – Hazira, Dahej – Baroda and Saurashtra pipeline distribution network 1200 km
|
|
|
|
|
| 2,800 km long pipeline survey |
Pipeline survey and investigation for cross-country pipelines including J&K – 2800 km
|
|
|
|
| |
| Topographical Survey to Maninagar DRS Area |
Topographical survey for Maninagar DRS Area related to proposed Ahmedabad city gas distribution network
|
|
|
|
| |
| 350km Kota-Jaipur- Rewari- Recconaisance |
Recconaissance Survey
|
|
|
|
|
| Detailed Route Survey from Kota to Jodhpur |
Detailed route survey of (Part E & Part G of HBJ Upgradation Project Phase - III Gadepan to Nayan gaon - 526 km length + GIS & LIS module for part G)
|
|
|
|
| |
| 600km Pipeline survey from Vadinar to Ratlam |
- Detailed Route Survey
- Geotechnical Investigations
- Hydrographic Survey along with Cadastral Survey
|
|
|
|
|
| Pipeline survey – Koyali – Sidhpur – Sanganer |
- Detailed route survey
- Cadastral survey
- Obtaining approvals
- ROU acquisition
|
|
|
|
| |
| Detailed route survey from Thulendi to Phulpur |
Detailed Route Survey - Pipeline route survey for HBJ upgradation Project Phase -III.
|
|
|
|
|
| Land acquisition to Kota Rewari project |
- Detailed route Survey
- Geotechnical Investigations
- Cadastral survey
|
|
|
|
| 440 Km Numaligarh – Guwahati – Siliguri Pipeline Project |
- Running Parallel to existing pipeline & conjested developed areas in Assam & West Bengal
- 130 Km Recce and Detailed Route Survey report for Onshore Oil Field Development facilities for CEIL
- 260 Km Pipeline to Industrial Area for the distribution of Gas to potential consumers in state of Madhya Pradesh.
|
|
|
|