|
|
|
|
- SECON has executed over 35,000 kms of pipeline projects
- Pipeline routing through difficult terrain having Coastal and Desert features, Wetlands, Evergreen Forests, Western Ghats and Densely Populated Cities
- More than 3 million man-hours of experience in pipeline projects
|
|
| |
Reconnaissance and Route Optimisation
- Desktop study of maps/ satellite imagery & identification of pipeline corridor site validation and confirmatory survey
- Center line survey and establishment of flag control points at definable & major crossing locations
- General appreciation of Terrain, Geology, Soil strata, Land Use, Forest Areas, Land Cost, Weather, Administrative Jurisdiction & Related Information
- For pipeline route optimisation we consider the following points:
- Safety of Pipeline and Public
- Shortest Pipeline Length
- Terrain Favourability
- Ground profile for Pipeline Hydraulics
- Infrastructure and Access
- Environmental Impact
- Existing and Future Developments
- Proximity of Distribution Center
|
|
Center Line and Detailed Route Survey
- Establishment of trench center line
- Staking & survey measurements for angles, distances & ground profile
- Preparation of strip plan, alignment and crossing drawings
- Meteorological data, population density, utility & administrative jurisdiction
|
|
Soil Stratification and Resistivity Survey
- Stratification survey of soil / rock along pipeline by auger boring & visual engineering classification
- Comprehensive corrosion survey, comprising resistivity survey, physical & chemical analysis of soil and water samples
|
|
Geotech, Hydrographic and Hydrological Investigations for HDD Crossing
- Deep boring for road, rail line and major river / creek crossings
- Hydrological and hydrographic investigations for crossing locations (water table, aquifer studies, flow pattern, high flood level, bathymetry of river and sea bed, silt pattern, scour depth, sub-bottom profiling)
|
|
ROU Acquisition, Permitting and Clearance
- Cadastral survey & Land information, ownership details, validation & data generation for ROU acquisition under Pipeline Act
- Data management system for property inventory, evaluation of land, crops and fertility loss for land compensation
- Assistance to CA for 3(1), 6(1) notification, serving of notices, recording of interest, payment of compensation
- Assistance in site selection and evaluation for intermediate stations
- Permitting & clearance from various statutory authorities, road, rail lines, foreign pipelines, underground and over ground utilities, coastal and defence land
|
|
EIA and EMP Studies
- Extensive data collection and analysis
- Socio-economic & environmental impact studies
- Pollution monitoring, risk analysis and disaster management
- Preparation of comprehensive EIA and EMP report for forest & environmental clearance
|
|
Engineering for Raw Water Transportation
- Sourcing of raw water
- Raw water transportation for booster station & hydro testing
|
|
GIS / MIS Database Software
- Generation of comprehensive GIS/MIS database integrating engineering and land information
- Creation of seamless drawings/ route maps with overlays for alignment sheets, stratification, corrosion survey, land information, disaster management and crossing details.
Proprietary software – ROU Master, SASG, PCM , BMS , SeconMap & PDMS are being extensively used by pipeline industry for data capture, processing, alignment, property documentation & ROU management
|
|